Step 3,  photo 3
Hexagonal beam by K4KIO
Drill holes for the
terminals 3/16"
After drilling the holes, install the SO239 with a lug on one bolt for the coax braid and all the
terminals with lugs as shown. Tighten with the lugs lined up and down the post for inserting the
coax.

Install pieces of coax between the terminals with all braid connections on the same side. Do not
mix from terminal to terminal as it will adversely affect performance.
Note how the coax is laid out. In this top view, terminals for six meters have been added. The
link from the SO239 connector to the top terminal (20M) is shown below.