Also pin the spreaders to the baseplate using the #6-32 X 1-1/2 bolts to prevent twisting of
the spreaders and chafing by the U bolts. Drill the holes in the spreaders and baseplate only
after the spreader positions have been fixed and the U bolts have been tightened.
Step 3 photo 4
Hex beam by K4KIO